반복적인 건설프로젝트의 공정계획방법에 관한 고찰
A Elementary Study on The Scheduling Methodology
of Repetitive Construction Project
▣ 목 차 ▣
1. 서론
2. 예비적 고찰
3. 반복적인 건설프로젝트의 공정계획 모형
4. 결론
Abstract
There have been a lot of repetitive construction project such as high-rise building, apartment housing project, highway etc. in Korea and must be a effective scheduling methodology of repetitive project for successful completion.
In order to give the scope of the scheduling methodology, this paper consists of the followings
1) the criteria of scheduling repetitive construction project
2) CPM & LOB in repetitive project scheduling
3) comparison of several scheduling models
1. 서론
1.1 연구의 배경 및 목적
지금까지 우리나라에서는 대규모의 건설프로젝트가 수행되어 왔으며 이러한 프로젝트 중 많은 부분이 초고층 건축물, 대규모 아파…